Muck-away calculator: tonnes and lorry loads
Enter the size of the dig and the type of ground. See the cubic metres in the ground and once dug, the weight in tonnes, and how many lorry loads it should take. Free, with no sign-up, and it works on your phone.
The answer
Fill in the size of the dig and press Work it out. The tonnes and loads show here.
How it works
Three steps, using typical figures for each type of ground.
-
Volume in the ground
Length times width times depth for each area, added together. This is the solid volume before anything is dug.
-
Weight and loose volume
The volume times the ground's density gives the tonnes, with a range from dry to wet. Times its bulking factor gives the loose volume once dug.
-
Lorry loads
The tonnes against the payload and the loose volume against the body size. Whichever fills first sets the loads, rounded up to the next half load.
| Ground | Tonnes per m³ in the ground | Bulking once dug |
|---|---|---|
| Topsoil or garden soil | 1.6 (1.4 to 1.9) | About 25% more |
| Clay | 1.9 (1.8 to 2.2) | About 30% more |
| Sandy or gravelly soil | 1.8 (1.6 to 2.0) | About 15% more |
| Chalk | 2.0 (1.8 to 2.2) | About 45% more |
| Broken concrete, brick or hardcore | 2.2 (1.9 to 2.4) | About 50% more |
For a layer of stone, sand or topsoil going in rather than coming out, use the aggregates calculator. The paperwork for the load is in the guide to waste transfer notes.
Questions about muck-away figures
If yours is not here, ask us.
How many tonnes is a cubic metre of soil?
About 1.6 tonnes for topsoil, 1.8 for sandy soil and 1.9 for clay, as it sits in the ground. Wet ground weighs more. Broken concrete and brick come in at about 2.2 tonnes. These are typical figures, not weighbridge readings.
Why is there more once it is dug?
Ground swells when it is dug, because air gets in between the lumps. Clay takes up about 30% more room loose than it did in the ground, and hardcore about 50% more. The lorry has to carry the loose volume, so the calculator works out both.
How are the lorry loads worked out?
Each load is limited by weight or by space, whichever runs out first. The calculator divides the tonnes by the payload and the loose volume by the body size, takes the larger, and rounds up to the next half load. Set the payload and body size to your own lorry.
Can I quote from these figures?
Use them as a starting point. Moisture, compaction and what is buried in the ground all change the weight, so look at the job and check the first load over a weighbridge. Soil that could be contaminated needs testing before it goes anywhere.
More for muck-away firms: Muck-away software Grab hire software Carrier registration Defra waste tracking Consignment notes for contaminated soil
WasteFriendly does this inside your office, for every quote
The same calculator is built into the WasteFriendly office. Work out the loads, see guide prices from your own price list, and start a quote with the figures already in it. The transfer note and the invoice then follow from the job.