Muck-away calculator: tonnes and lorry loads

Enter the size of the dig and the type of ground. See the cubic metres in the ground and once dug, the weight in tonnes, and how many lorry loads it should take. Free, with no sign-up, and it works on your phone.

The dig

Add an area for each part of the job, such as a trench and a slab, and they are added together.

Area 1

16 tonnes or 14 cubic yards is a typical eight-wheel grab lorry. Change it to suit your own lorry.

This works in your browser. Nothing you type is sent to us or saved.

The answer

Fill in the size of the dig and press Work it out. The tonnes and loads show here.

How it works

Three steps, using typical figures for each type of ground.

  1. Volume in the ground

    Length times width times depth for each area, added together. This is the solid volume before anything is dug.

  2. Weight and loose volume

    The volume times the ground's density gives the tonnes, with a range from dry to wet. Times its bulking factor gives the loose volume once dug.

  3. Lorry loads

    The tonnes against the payload and the loose volume against the body size. Whichever fills first sets the loads, rounded up to the next half load.

The figures the calculator uses for each type of ground
GroundTonnes per m³ in the groundBulking once dug
Topsoil or garden soil1.6 (1.4 to 1.9)About 25% more
Clay1.9 (1.8 to 2.2)About 30% more
Sandy or gravelly soil1.8 (1.6 to 2.0)About 15% more
Chalk2.0 (1.8 to 2.2)About 45% more
Broken concrete, brick or hardcore2.2 (1.9 to 2.4)About 50% more

For a layer of stone, sand or topsoil going in rather than coming out, use the aggregates calculator. The paperwork for the load is in the guide to waste transfer notes.

Questions about muck-away figures

If yours is not here, ask us.

How many tonnes is a cubic metre of soil?

About 1.6 tonnes for topsoil, 1.8 for sandy soil and 1.9 for clay, as it sits in the ground. Wet ground weighs more. Broken concrete and brick come in at about 2.2 tonnes. These are typical figures, not weighbridge readings.

Why is there more once it is dug?

Ground swells when it is dug, because air gets in between the lumps. Clay takes up about 30% more room loose than it did in the ground, and hardcore about 50% more. The lorry has to carry the loose volume, so the calculator works out both.

How are the lorry loads worked out?

Each load is limited by weight or by space, whichever runs out first. The calculator divides the tonnes by the payload and the loose volume by the body size, takes the larger, and rounds up to the next half load. Set the payload and body size to your own lorry.

Can I quote from these figures?

Use them as a starting point. Moisture, compaction and what is buried in the ground all change the weight, so look at the job and check the first load over a weighbridge. Soil that could be contaminated needs testing before it goes anywhere.

WasteFriendly does this inside your office, for every quote

The same calculator is built into the WasteFriendly office. Work out the loads, see guide prices from your own price list, and start a quote with the figures already in it. The transfer note and the invoice then follow from the job.